  • Nga Awa Purua Geothermal Power Station :
    AllGen staff provided technical supervision for the overhaul Fuji 148 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbine, Generator and Hot well Pumps.
  • Date : 2017
Project Details

– AllGen Supervisors Ryan Delgado and Ramel Luna undertaking inspection and monitoring on the turbine axial and radial clearances during lifting at Nga Awa Purua PS.

– AllGen Supervisor Alan Robinson with his crew after successful removal of Fuji Generator Rotor