Project Info
- Construction Date: 2014
- Category: Technical Investigations and services
- 2014 : AllGen’s sister company roGen undertook a detailed review of two boiler fed steam turbines that had failed during operation. The turbine condition was assessed and potential repair methodologies developed. A decision flow diagram was also developed with provisional timing and costing for the client to review and decide on the optimal operational and financial repair process.
Project Details
Inspection of the Bellis 2.5 MW rotor at Whakatane Mill