Case Study No. 2 – Wayang Windu Power Station, Indonesia

Project Info
  • Construction Date: 2013
  • Category: Technical Investigations and services
  • 2013 :
    AllGen’s sister company roGen undertook a technical review of the turbine rotor to

    • Assess rotor condition,
    • Determine applicable repair methodologies,
    • Assess life cycle costs for each methodology, and
    • Develop a repair recommendation.
Project Details
More Project Details

Enter your keyword