Case Study No. 4 – Malitbog Geothermal Power Station

Project Info
  • Construction Date: 2000 to 2015
  • Category: Overhaul Supervision & Project Management
  • 2015 : AllGen provided technical supervision support for the overhaul of the MBCP bottoming plant steam turbine overhaul 16MW GE Turbine.
  • 2006 : AllGen provided technical supervision for the overhaul of the turbine units 1 and 2 which are Fuji 80 MW units. The work also included steam cylinder levelling and alignment and the strip, clean and reassembly of the Fuji generators on Units 2 and 3 (80 MW).
  • 2005 : AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and steam cylinder levelling and alignment.
  • 2003 : AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators
  • 2002 : AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators.
  • 2000 : AllGen staff provided technical supervision for the overhaul of 2 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines.
Project Details
More Project Details

Enter your keyword