2015 :
AllGen provided technical supervision support for the overhaul of the MBCP bottoming plant steam turbine overhaul 16MW GE Turbine.
2006 :
AllGen provided technical supervision for the overhaul of the turbine units 1 and 2 which are Fuji 80 MW units. The work also included steam cylinder levelling and alignment and the strip, clean and reassembly of the Fuji generators on Units 2 and 3 (80 MW).
2005 :
AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and steam cylinder levelling and alignment.
2003 :
AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators
2002 :
AllGen staff provided technical supervision for the overhaul of 3 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines and strip, clean and reassembly of the generators.
2000 :
AllGen staff provided technical supervision for the overhaul of 2 Fuji 80 MW geothermal turbines. The overhaul included full strip down, clean and refurbishment of the geothermal turbines.