Project Info
- Construction Date: 2001 to 2014
- Category: Overhaul Supervision & Project Management
- 2014 : AllGen staff provided technical supervision of the overhauls to Unit 2 Toshiba 60 MW geothermal turbines.
- 2013 : AllGen staff provided technical supervision of the overhauls to Unit 1 Toshiba 60 MW geothermal turbines.
- 2006 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
- 2005 : AllGen staff provided technical supervision of the overhauls to 2 Toshiba 60 MW geothermal turbines.
- 2003 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
- 2002 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
- 2001 : AllGen staff provided technical supervision of an emergency turbine rotor change on a Toshiba 60 MW geothermal turbine.
Project Details
AllGen / ProGen supervisors inspecting the turbine steam cylinder components at Mahanagdong PS