Case Study No. 5 – Mahanagdong A & B Geothermal Power Stations

Project Info
  • Construction Date: 2001 to 2014
  • Category: Overhaul Supervision & Project Management
  • 2014 : AllGen staff provided technical supervision of the overhauls to Unit 2 Toshiba 60 MW geothermal turbines.
  • 2013 : AllGen staff provided technical supervision of the overhauls to Unit 1 Toshiba 60 MW geothermal turbines.
  • 2006 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
  • 2005 : AllGen staff provided technical supervision of the overhauls to 2 Toshiba 60 MW geothermal turbines.
  • 2003 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
  • 2002 : AllGen staff provided technical supervision of the overhauls to 3 Toshiba 60 MW geothermal turbines.
  • 2001 : AllGen staff provided technical supervision of an emergency turbine rotor change on a Toshiba 60 MW geothermal turbine.
Project Details

AllGen / ProGen supervisors inspecting the turbine steam cylinder components at Mahanagdong PS

More Project Details