Case Study No. 6 – Wayang Windu Power Station, Indonesia
– AllGen Supervisors, Manolito Batulan and Ramel Luna recording turbine shaft axial at Wayang Windu PS
– AllGen supervising the turnover of the turbine casing of at Wayang Windu PS
– AllGen Supervisors, Manolito Batulan and Ramel Luna recording turbine shaft axial at Wayang Windu PS
– AllGen supervising the turnover of the turbine casing of at Wayang Windu PS
AllGen & Genesis staff removing 250 MW Generator rotor
AllGen Director Manolito Batulan inspecting Mitsubishi 52MW turbine diaphragms rotor at Mt Apo PS