Year | Owner | Station | Work |
2015 | Star Energy, Indonesia | Wayang Windu | Technical Supervision for the:
• Rebuild and commissioning of Unit 1 120 MW Fuji Geothermal Steam Turbine-Generator • Rebuild and commissioning of Unit 2 120 MW Fuji Geothermal Steam Turbine- Generator |
2015 | Star Energy, Indonesia | Wayang Windu | Technical Supervision for the:
• Full strip and preservation of Unit 1 120MW Fuji Geothermal Steam Turbine- Generator • Full strip and preservation of Unit 2 120MW Fuji Geothermal Steam Turbine- Generator |
2015 | Newcrest Mining, PNG | Lihir | Technical Supervision of GE Unit 5, 20MW; geothermal steam turbine overhaul which include the following tasks:
-Turbine parts inspection, conduct preventive and corrective assessments. -Repair and modification of steam turbine rotating blades and stationary diaphragm blades -Inspection of Gear Box components; Bull gear, pinion and bearing thrust. -Inspection of Generator components; Bearing, Journal, Stator, Exciter stator and rotor. -Servicing the governor valve, main stop valve and 2 units isolation stop valves. -Servicing the Lube oil pumps and oil tank. |
2014 | EDC, Philippines | Malitbog MBCP | Technical Field Advisor for 16 MW GE Bottoming Cycle Power Plant overhaul. |
2014 | Newcrest Mining,
PNG |
Lihir | Technical Supervision of GE Unit 4, 20 MW, turbine parts inspection and assessment; repair and modification of turbine blades; reassembly of turbine unit. |
2014 | EDC, Philippines | Mahanagdong | Technical supervision of unit 2 Toshiba 60MW geothermal turbine overhaul and inspections. |
2013
|
EDC, Philippines
EDC, Philippines |
Mt. Apo
Mahanagdong |
Technical supervision of unit 1 Mitsubishi 52.3 MW geothermal turbine overhaul and inspections.
Technical supervision of unit 1 Toshiba 60MW geothermal turbine overhaul and inspections. |
2013 | Newcrest Mining, PNG | Lihir | GE Turbine refurbishment including rotor change. |
2013 | Star Energy, Indonesia |
Wayang Windu | Technical inspection of Fuji 110 MW turbine rotor & recommendation for refurbishment. |
2012 | Newcrest Mining, PNG | Lihir | GE Turbine – complete turbine service. |
2011 | Newcrest Mining, PNG | Lihir | GE Turbine – complete turbine service. |
2011 | PT Sulzer Turbo Services, Indonesia | Kamojang | Provide technical supervision and support for turbine/generator strip down and rebuild. |
2010 | Chevron Geothermal Indonesia | Gunung Salak | 3 X 65 MW Fuji units. Technical Advisor for overhauls of the 3 Turbines. |
2010 | Star Energy Indonesia |
Wayang Windu | 110 MW Fuji. Shift Supervision of Unit 2 Turbine Warranty Inspection. |
2009 | Star Energy Indonesia |
Wayang Windu | 110 MW Fuji. Shift Supervision of Unit 1 Turbine Overhaul. |
2009 | Lihir Gold, PNG | Lihir | Supervision of overhaul on GE geothermal steam turbine. |
2009 | Marubeni Energy Mindanao Philippines |
M2GP Mount Apo |
51 MW Mitsubishi. Turn-Key overhaul of Turbine, Generator and balance of Plant |
2008 | Lihir Gold, PNG | Lihir | Supervision of 3 overhauls on GE Geothermal steam turbines |
2007 | Lihir Gold, PNG | Lihir | Supervision of rotor change-out on a GE geothermal steam turbine following rotor damage. |
2006 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of units 1, 2 and 3 Toshiba 60MW geothermal turbine overhauls and inspections. Steam rotor replacements and gland housing refurbishment and replacement. |
2006 | CalEnergy International, Philippines | Malitbog | Technical supervision of units 1 and 2 Fuji 80MW geothermal turbine overhauls and steam cylinder levelling and alignment. Unit 2 and 3 generator rotor removal and replacement. |
2005 | CalEnergy International, Philippines | Mahanagdong | Technical supervision and support for unit 3 Toshiba 60MW geothermal turbine emergency rotor replacement. |
2005 | CalEnergy International, Philippines | Malitbog | Technical supervision 3 Fuji 80MW geothermal turbine overhauls, including steam cylinder levelling and alignment. |
2005 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of unit 2 Toshiba 60MW geothermal turbine overhaul and inspection. |
2004 | Contact Energy, New Zealand | Poihipi | Technical supervision and support for 55MW Fuji geothermal turbine overhaul that included re-levelling of the turbine and refurbishment of the steam path and governor oil system components. |
2003 | Contact Energy, New Zealand | Wairakei | Supervision of G13 30MW AEI geothermal turbine overhaul. |
2003 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of 3 Toshiba 60MW geothermal overhauls. |
2003 | Jasa Daya Unocal, Indonesia | Wayang Windu | Complete overhaul service of a Fuji 110MW geothermal turbine. Planning, staffing and management of turbine / generator strip down, refurbish and rebuild. |
2003 | CalEnergy International, Philippines | Malitbog | Technical supervision 3 Fuji 80MW geothermal turbine overhauls |
2002 | Contact Energy, New Zealand | Wairakei | Management, staffing and supervision of Unit G12 30MW AEI geothermal turbine overhaul |
2002 | Himpurna California Energy, Indonesia | Dieng | Technical supervision of overhaul / refurbishment of a 60MW Ansaldo geothermal turbine. |
2002 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of 3 Toshiba 60MW geothermal overhauls. |
2002 | Contact Energy, New Zealand | Wairakei | Management, staffing and supervision of Unit G14 6MW hybrid geothermal turbine overhaul |
2002 | CalEnergy International, Philippines | Malitbog | Technical supervision 3 Fuji 80MW geothermal turbine overhauls |
2001 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of 3 Toshiba 60MW geothermal overhauls. |
2001 | CalEnergy International, Philippines | Mahanagdong | Technical supervision of an emergency turbine rotor change of a Toshiba 60MW turbine. |
2000 | CalEnergy International, Philippines | Malitbog | Technical supervision 2 Fuji 80MW geothermal turbine overhauls |
1999 | Contact Energy, New Zealand | Wairakei | Supervision and management support for two overhauls. |